Melkoeya LNG Plant Restarts Operations

Monday, January 14, 2019

Norwegian oil and gas firm Equinor has restarted operations at its Melkoeya LNG plant after an outage ten days ago, the company said on Monday.

The plant, which liquefies natural gas from the Arctic Snoehvit gas field for transportation by tankers, has been shut since Jan. 4 due to a compressor failure.


(Reporting by Nerijus Adomaitis, editing by Terje Solsvik)

Categories: Tankers Ports LNG Europe Natural Gas

Related Stories

Seatrium Delivers Fifth Jack-Up to Borr Drilling

Sunda Energy Pushes Back Chuditch-2 Appraisal Well Drilling Date

ABS Gives Its Blessing to SHI’s Ammonia FPSO Design

ADNOC Signs 15-Year LNG Supply Deal with Indian Oil

Oil Loadings at Russia's Western Ports on the Rise

Santos Pens Mid-Term LNG Supply Deal

Environmental Group Backs Out of Scarborough Litigation

Equinor Picks SHI as Preferred Supplier for Korean 750 MW Floating Wind Project

ADNOC Signs LNG Supply Agreement with Osaka Gas for Ruwais LNG Project

Russia Opens 2024 Arctic Route for Shipping Urals Crude to Asia

Current News

Sapura Scoops Petrobras Contract for Pan-Malaysia Offshore Services

Velesto’s Drilling Rigs Up for Automatization Overhaul Under New Tech Alliance

US Firm Finds Chinese Partner to Deliver Mobile Offshore Drilling Units

TotalEnergies and Oil India to Jointly Tackle Methane Emissions Issues

Keppel Reclaiming Control of 13 Rigs to Cash In on Offshore Drilling Market's Growth

Global Offshore Wind Stumbles to the End of '24

Seatrium Delivers Fifth Jack-Up to Borr Drilling

Malaysia's FPSO Firm Bumi Armada Eyes Merger with MISC’s Offshore Unit

Global OTEC Presents OTEC Power Module for Remote Offshore Platforms

Beam’s AI-Driven AUV to Hit Offshore Wind Market in 2025

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com