Gazprom Starts Operations at Final Yamal Unit

Wednesday, December 5, 2018

Russian gas giant Gazprom said on Wednesday it had begun operations at a third and final unit at its Bovanenkovo gas field on the Arctic Yamal peninsula, allowing it to boost natural gas production.

Gazprom also said it had increased the capacity of the Ukhta-Torzhok gas pipeline, aimed at facilitating Russian gas exports to northern Europe, including via the Nord Stream pipeline.

Gazprom plans to export record-high natural gas volumes of 200 bcm to Europe this year.

The company said that with the launch of the final unit, Bovanenkovo will reach a projected capacity of 115 billion cubic meters (bcm) of gas per year.

The gas field with reserves of just under 5 trillion cubic meters - on par with global annual gas demand - is key to the company's efforts to tap new deposits, apart from its traditional producing region of Western Siberia.

Last year, it produced 82.8 bcm of gas.


(Reporting by Vladimir Soldatkin; editing by David Evans)

Categories: LNG Russia Arctic Natural Gas

Related Stories

Russian Oil Companies Told to Boost Fuel Supply to Domestic Market

Papua LNG Project Requires 'More Work' to Reach FID, TotalEnergy Says

Japan’s Mitsubishi Invests in EIG’s LNG Unit MidOcean Energy

Gazprom Uses Replacement Vessel to Maintain Gas Loadings

Petronas Starts Construction of Malaysia's First Nearshore FLNG Facility

Nebula Energy’s AG&P LNG Secures 20-Year LNG Terminal Deal in Indonesia

Singapore's Temasek Shortlists Saudi Aramco, Shell in Sale of Pavilion Energy Assets

Digitalization is Drawing CCS a New Learning Curve

Woodside Sells 15.1% Scarborough Stake to JERA for $1.4B

QatarEnergy Signs 15-year LNG Supply Deal with Excelerate Energy

Current News

SOVs – Analyzing Current, Future Demand Drivers

Decarbonization Offshore O&G: Navigating the Path Forward

Subsea Vessel Market is Full Steam Ahead

China's Imports of Russian Oil Near Record High

TotalEnergies Inks $530M Deal to Acquire Malaysia’s SapuraOMV

Energy Storage on O&G Platforms - A Safety Boost, too?

Malampaya Gas Field Exceeds Export Capacity Amid Grid Demands in Philippines

Timor-Leste: Chuditch-2 Well to be Drilled at New Location Following Site Surveys

Akastor’s Subsidiary Wins $101M Case Against Seatrium's Jurong Shipyard

ONGC Hires Consortium to Deliver FEED Work for Bay of Bengal Oil Field

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com