Van Oord Contracts Tekmar Borssele 2 Offshore Wind Project

Laxman Pai
Tuesday, November 27, 2018

The subsea cables and engineering services provider Tekmar Energy announced that international marine contractor Van Oord has selected the patented Tekmar Cable Protection System (CPS) TekLink Mechanical Latch for the Borssele 2 (site III and IV) offshore wind farm.

According to a press release from the offshore wind cable protection systems company, Borssele 2 consisting of 77 turbines and a total of 731.5 MW, will go into construction off the coast of Zeeland, the Netherlands in 2020.

James Ritchie, CEO of Tekmar Group plc, said: “We are delighted that Van Oord has chosen Tekmar for Borssele 2. This continues our trusted relationship together following the successful award from Van Oord for Deutsche Bucht and BorWin3 earlier in 2018, and continues our success on Borssele following the award of Borssele I and II by Ørsted in July.”

As part of the project, Tekmar will be supplying their latest TekLink® Generation 8 cable protection system.

Jack Simpson, Director at Tekmar Energy, said: “We continue to innovate to help clients reduce cost and risk for the next generation of offshore wind farm developments.”

Jack continued: “Clients choose Tekmar due to our track record, commitment to HSQE and overall cost savings via lifetime product reliability and product performance during installation and operation.”

“Cable protection systems are a vital product for protecting the electrical infrastructure of the wind farm projects. To coin the phrase, the chain is only as strong as the weakest link. Tekmar are trusted on over 21GW of electrical infrastructure and remain the global leader in this area.”

The product will be produced within Tekmar’s state of the art manufacturing facility in the North East of England, which also recently became the first facility in the UK to achieve ISO 45001:2018 accreditation.

Borssele 2 mark Tekmar’s 65th project within the industry, taking the total number of systems over 6,200 and 21GW of protected electrical infrastructure worldwide.

Tekmar Energy Limited is one of Tekmar Group plc’s three primary operating companies, in addition to and Subsea Innovation Limited and AgileTek Engineering Limited.

Tekmar Group’s vision is to become the partner of choice for the supply and installation support of subsea protection equipment to the global offshore energy markets.

Categories: Contracts Cable ships Wind Power Offshore Wind Subsea Cables

Related Stories

Offshore Energy and Boosting the Energy Efficiency of Water Processes

India Seeks $30B from Reliance, BP Over Gas Shortfall at Offshore Fields

Russia Gives ExxonMobil More Time to Exit Sakhalin-1 Oil and Gas Project

Yinson Production Cuts First Steel for Vietnam-Bound FSO

CNOOC Makes Major Oil Discovery in Bohai Sea

DOF Bags Two Deals in Asia-Pacific Region

Mooreast to Assess Feasibility of Floating Renewables Push in Timor-Leste

Sponsored: Energy and Finance Chiefs Call for Sound Policy, Stable Frameworks at ADIPEC

Sponsored: Policy, AI, and Capital Take Center Stage at ADIPEC 2025

Southeast Asia’s 2GW Cross-Border Offshore Wind Scheme Targets 2034 Buildout

Current News

Vantris Energy Lands Petronas Job on Malaysia’s Offshore Fields

Murphy Oil Appraisal Well Boosts Resource Outlook at Field off Vietnam

Viridien Kicks Off Multi-Client Reimaging Program off Malaysia

Petrovietnam Agrees First-Ever LNG Term Deal with Shell

ADNOC Takes FID on SARB Deep Gas Project Offshore Abu Dhabi

Jereh Group Delivers Oil Separation Systems for Petrobras’ FPSO Units

Offshore Rig Outlook: As 2025 Challenges Fade, Path Ahead Brightens

Offshore Energy and Boosting the Energy Efficiency of Water Processes

Low Demand, High Supply Keeps Asia LNG Spot Prices Flat

Following Big Loss in 2025, Oil Steadies

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com