Aquaterra to Install Two Platforms for FIRST E&P in Nigeria

Laxman Pai
Tuesday, November 27, 2018

Global offshore engineering solutions provider Aquaterra Energy in conjunction with Maerlin Nigeria Ltd, its local partner, has been awarded a contract by FIRST Exploration and Petroleum Development Company Ltd (FIRST E&P) to design, engineer and install two non-identical Sea Swift conductor-supported offshore platforms in the Niger Delta Basin.

The provider of offshore engineering solutions and technical support for the oil and gas industry in the United Kingdom and internationally said in a press release that the platforms are destined for the Anyala and Madu fields within Oil Mining Leases 83 and 85 offshore Nigeria, where state-owned Nigerian National Petroleum Corporation (NNPC) is a joint venture partner.

The Anyala and Madu field project scope will develop approximately 185 million barrels of oil and 637 billion cubic feet of gas reserves, it said.

Aquaterra Energy will manage the end-to-end project scope with engineering and onsite fabrication support being performed in Nigeria. The work includes structural design, topsides engineering, equipment selection, procurement, fabrication management and logistics. Once complete, the platforms will be installed in water depths of 35m to 55m with first oil expected in late 2019.

Stewart Maxwell, Technical Director at Aquaterra Energy, says: “To meet FIRST E&P’s goal of reaching first oil in 2019, a modern approach to platform development is required, and a partner with the technical expertise to develop a cost-effective, comprehensive solution that could be designed, engineered and delivered rapidly. With six Sea Swift platforms operational globally, including four offshore Africa, our team has the breadth of experience and technical know-how to solve client challenges like these in a safe, cost-effective and timely manner.”

Aquaterra Energy’s Sea Swift offshore platform is a modular system that combines an offshore platform with the rig-run benefits of a subsea development. This offers operators a flexible option to reduce their build and installation costs, and importantly reduce time to first oil in shallow water applications.

Categories: Offshore Offshore Energy Engineering Platform Design

Related Stories

Australia and Timor-Leste Push to Advance Greater Sunrise Gas Field

Chevron in Final Talks with Eneos, Glencore on Singapore Assets Sale

Woodside to Supply LNG to JERA During Japan's Winter Peak

DOF Bags Two Deals in Asia-Pacific Region

MODEC Forms Dedicated Mooring Solutions Unit

Major Oil and Gas Projects Drive Strong OSV Demand in the Middle East

How Hot Is Your Cable? Understanding Subsea Cable Thermal Performance

Viridien to Shed More Light on Malaysia’s Offshore Oil and Gas Potential

US Pressure on India Could Propel Russia's Shadow Oil Exports

RINA Wins FEED Contract for Petronas’ Flagship CCS Project in Malaysia

Current News

Petronas Plans Ramp-Up in Exploration, Production Over Three Years

Australia and Timor-Leste Push to Advance Greater Sunrise Gas Field

MODEC, Eld Energy Partnership Targets Low-Carbon FPSO Power

JERA Lifts First LNG Cargo From Barossa Gas Project in Australia

Inpex Moves to Accelerate Indonesia’s Abadi LNG Project

Chevron in Final Talks with Eneos, Glencore on Singapore Assets Sale

Seadrill Firms Up Offshore Drilling Workload with Multi-Region Contract Awards

Turkish Petroleum, Chevron Discuss Joint Oil and Gas Exploration

ADNOC Gas Signs $3B LNG Supply Deal with India’s HPCL

Samos Energy Buys Suksan Salamander FSO from Altera Infrastructure

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com