Lukoil Groundbreaking Ceremony at Rakushechnoye Field

Laxman Pai
Wednesday, October 17, 2018

Russia's Lukoil informed its President Vagit Alekperov, jointly with Head of the Astrakhan Region Sergey Morozov, took part in the official groundbreaking ceremony to mark the start of construction of infrastructure facilities of Rakushechnoye field.

This is the Company's third large project in the Caspian Sea alongside with two other fields, Yury Korchagin and Vladimir Filanovsky.

Commercial oil production, with an estimated plateau level of 1.2 million tonnes, is expected to commence in 2023.

Proximity to the Сompany's other Caspian fields makes it possible to use already available power supply facilities and infrastructure for the treatment and shipping of the products, thus contributing to an overall optimization of the project.

The Rakushechnoye field's infrastructure includes an ice-resistant fixed offshore platform and a living-quarter platform, interconnected with a gallery bridge. All the facilities will be built by a Russian contractor at shipbuilding yards in the Astrakhan Region.

Categories: Contracts Construction and Design Engineering

Related Stories

Iran Outlines Terms for Restoring Hormuz Shipping

Iran-Oman Talks on Hormuz Reopening Drive Down Oil Prices

Saudi Contractor Enters Oman with Four-Well Drilling Assignment

Iran Tightens Enforcement of Strait of Hormuz Transit Rules

ConocoPhillips, CNOOC Put Penglai Field off China Into Full Operation

India’s ONGC to Allocate Half of New Oil Storage to Strategic Reserves

Subsea7 Lands ‘Sizeable’ Contract for Work Offshore Brunei

Keppel Launches $2.9B Program to Monetize Legacy Offshore Drilling Rigs

Saipem Cuts Earnings Outlook as Middle East Costs Rise

Serica Energy Agrees $194M Pharos Energy Acquisition

Current News

PTTEP, Petronas Ink 35-Year Malaysia-Thailand Gas Deals

Iran Outlines Terms for Restoring Hormuz Shipping

Technip Energies Nets Engineering Services Job for ADNOC Offshore

Seatrium Nears Dual FPSO Sailaway for Petrobras' Búzios Field

Strait of Hormuz Shipping Marks Slight Rise

China's CNOOC Posts Record First-Half Profit

BP Completes Central Azeri Platform Maintenance, Ramps Up Production

Iran-Oman Talks on Hormuz Reopening Drive Down Oil Prices

Viridien Progresses Hybrid Multi-Client Survey Offshore Malaysia

TGS Extends Work on Indonesia’s Largest Seismic Acquisition Project

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com