World's Second Floating LNG Project Starts Production in Cameroon

Posted by Michelle Howard
Monday, March 12, 2018
Norwegian shipping firm Golar LNG on Monday said liquefied natural gas (LNG) production had started at its floating LNG production platform in Cameroon, the world's second working example of the nascent technology.

The trading arm of Russia's Gazprom has purchased the entire 1.2 million tonne per annum output from Golar's FLNG platform, the Hilli Episeyo, for eight years.

The deal was agreed in late 2015 between Golar, Gazprom Marketing and Trading, Cameroon's state-run Societe Nationale des Hydrocarbures and Perenco Cameroon.

Golar LNG gave no indication of when the Hilli would achieve commercial LNG production or begin exports.

First LNG deliveries were initially targeted for the second half of 2017.

The first ever FLNG project came on stream in Malaysia last year, developed by state-run energy giant Petronas, but the project has operated at a fraction of its production capacity.
Reporting by Oleg Vukmanovic
Categories: Energy LNG Offshore Energy Logistics

Related Stories

Searah Starts Production from New Bukit Tua Well Offshore Indonesia

Shell Brings Deepwater Gas Fields Onstream off Malaysia

Shell to Exit Australia's North West Shelf Project in $1.45B Deal with XRG

PTTEP, Eni Launch Joint Venture for ADNOC-Operated Ghasha Offshore Project

ADNOC Signs Multi-Year LNG Supply Deal with Thailand’s Gulf Group

TGS to Reprocesses Seismic Data for Petronas’ Megah Discovery

Qatar-Linked LNG Tankers Resume Hormuz Transits

Fugro Adds More Survey Work off Timor-Leste

Southeast Asia Plans 100 GW-Plus Gas Power Expansion Despite LNG Risks

QatarEnergy's LNG Expansion Faces Delays from Hormuz Crisis

Current News

Masirah Oil Delays Yumna Production as Drilling Progresses off Oman

Searah Starts Production from New Bukit Tua Well Offshore Indonesia

NMDC Energy to Acquire Wasco’s Engineering Division for $190M

China’s COOEC Lands $800M QatarEnergy Subsea Contract

Oil Prices Rise as Houthi Strikes Revive Supply Disruption Fears

COSL Places $1.64B Order for 59 Offshore Support Vessels

When Contractors Collide: Keeping Offshore Energy Projects on Schedule

Floating Production Outlook: Pipeline Looks Huge, But Not All Projects Are Created Equal

Shell Brings Deepwater Gas Fields Onstream off Malaysia

Hanwha Power Secures FSRU Conversion Deal with Energos

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com