MISC Berhad Names FSO Benchamas 2

Monday, March 12, 2018

MISC Berhad held the naming and delivery ceremony of its new Floating, Storage & Offloading (FSO) facility for Chevron Offshore (Thailand) Limited (COTL), the FSO Benchamas 2. The project marks MISC’s maiden foray into Thailand’s offshore oil and gas sector as well as its first partnership with COTL in the offshore space.

The contract for the lease and operations FSO was secured through an international competitive bidding process and was signed between MISC Offshore Floating Terminals (L) Limited (MOFT) and COTL in August 2016. The FSO will be deployed for a full field development for COTL at the Benchamas field in the Gulf of Thailand. Conversion works for the FSO Benchamas 2 Project commenced in early 2017 and completed as planned. FSO Benchamas 2 Project took over 2.2 million man-hours to complete, with zero Lost Time Injury (LTI).
MISC’s President/Group Chief Executive Officer, Yee Yang Chien, said, “FSO Benchamas 2 is a significant achievement for MISC, being our first collaboration with Chevron in the offshore segment. With our broad spectrum of energy related maritime solutions and services, be it in energy shipping or offshore solutions, MISC is confident of our ability to serve the various needs of the global oil and gas industry. We are honored for the trust and opportunity given to MISC for us to work together with COTL towards the development and sustainability of Thailand’s oil and gas sector.”
“Today, we have pushed boundaries in achieving our aspirations of having an FSO facility in Thailand into a reality. This project represents our commitment to conduct our business in a responsible and sustainable manner as well as to execute this project effectively. We aim to pursue other exciting opportunities that will contribute towards mutually developing and strengthening MISC’s as well as our business partner’s position in the ASEAN region’s oil and gas industry,” added Yee Yang Chien.
FSO Benchamas 2 has a storage capacity of 650,000 barrels with 12 years design life without dry-docking.
The ceremony was held at MMHE West Yard, Pasir Gudang, Johor and attended by COTL’s President, Pairoj Kaweeyanun; Lady Sponsor of the FSO, Nuntana Kaweeyanun; MISC’s President/Group Chief Executive Officer, Yee Yang Chien; Vice President of Offshore Business Unit, Tuan Syed Hashim Syed Abdullah as well as management and representatives from COTL, MISC, MHB and other guests.
Categories: Offshore Offshore Energy Vessels

Related Stories

ABL to Support Platform Installations, Rig Moves for Chevron in Gulf of Thailand

Synergy Marine Group Completes Conversion of LNG Vessel to FSRU

Marco Polo Picks Salt Ship Design for Next-Gen Offshore Energy CSOV

Seatrium Signs FLNG Vessel Upgrade Deal for Golar LNG

PXGEO Nets First Seismic Survey off Malaysia

Shipbuilder Delivers Fast Crew Boat Pair to Aesen

Saipem Marks First Steel Cut for Tangguh UCC Project at Karimun Yard

Saipem Wins FEED Contract For Abadi LNG Project FPSO Module In Indonesia

SBM Offshore’s Jaguar FPSO Enters Drydock in Singapore (Video)

Woodside Finds South Korean Partners to Advance LNG Value Chain

Current News

Major Oil and Gas Projects Drive Strong OSV Demand in the Middle East

ABL to Support Platform Installations, Rig Moves for Chevron in Gulf of Thailand

PTTEP Orders OneSubsea Systems for Two Deepwater Projects off Malaysia

Russia's Lukoil Takes Up Gunvor’s Offer for Foreign Assets

How Hot Is Your Cable? Understanding Subsea Cable Thermal Performance

Sponsored: UAE Breaks Ground on GW-Scale Renewable Energy Hybrid

Pertamina Joins Petronas in Ultra-Deepwater Asset off Indonesia

Malaysia’s Petronas and Oman’s OQEP Strengthen Oil and Gas Ties

Southeast Asia’s 2GW Cross-Border Offshore Wind Scheme Targets 2034 Buildout

Pharos Energy Kicks Off Drilling Campaign Offshore Vietnam

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

https://accounts.newwavemedia.com