LogIn LogOut

Trelleborg supplies NC3 floatover equipment

October 17, 2016

Trelleborg’s engineered products operation has delivered the floatover equipment for the Petronas NC3 gas field, located in Block SK316, 200km north of Bintulu, Sarawak in Malaysia.  

Trelleborg provided PAPE Engineering, an engineering company responsible for the transportation and installation of the platform jacket and topside, with four leg mating units (LMUs), as well as four sway fenders, four loadout pads and four deck support units (DSU).  

The LMU installation was performed at the fabrication yard before the floatover operation commenced. 

“Trelleborg site service engineers were able to provide supervised on-site support, ensuring a seamless LMU installation within the topside of the Central Processing Platform,” said Olivier Beauclair, director for platform transportation and installation, PAPE.



Current News

Iran Goes Solo at South Pars Field as Total, CNPC Pull Out

Iran Goes Solo at South Pars Field as Total, CNPC Pull Out

Pacific Radiance Eyeing New Loan Source

Pacific Radiance Eyeing New Loan Source

GlobalData: Gas to Dominate 2020 O&G FIDs

GlobalData: Gas to Dominate 2020 O&G FIDs

Permanent Deals for Monadelphous' Ichthys Workers

Permanent Deals for Monadelphous' Ichthys Workers

Bumi Armada Loses Woodside FPSO Case

Bumi Armada Loses Woodside FPSO Case

Chevron to Ditch Indonesian Deepwater Development Stake?

Chevron to Ditch Indonesian Deepwater Development Stake?

Keppel O&M Turns Profitable in 2019

Keppel O&M Turns Profitable in 2019

Subscribe for AOG Digital E‑News

AOG Digital E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week